GENERAL INFORMATION
Sistem Ltd. is active in the businesses of designing and implementing
industrial and buildings mechanical installations, as well as
providing services for the development of various power plant
projects.
Date of Establishment
Paid in Capital
Total turnover 1994-2003
Business Purpose |
: 24 August 1992
: TRL 5.000.000.000
: 1.887.517.421.000.-T
: Engineering and Consultancy Services |
Area of Business :
The company, an affiliate of DOGA HOLDING AS, is capable of undertaking
design and implementation works for HVAC and refrigeration of
all kinds of buildings. For this purpose, the holding company
has formed a separate Mechanical Installations Project Group within
its organization and has successfully completed several projects
on turnkey basis.
Since its establishment the Company has been supplying mechanical
engineering and consultancy services for Bogazkoy and Esenkent
Mass Housing developments as well as for Natural Gas Power Plants,
all realized in Esenyurt region. Among those services, the most
important ones are the largest cogeneration and District Heating
Project of Turkey, namely Bogazkoy and Esenkent District Heating
Networks. Currently Sistem Ltd. is involved in 390 MW Bogazkoy
Power Plant Project and Bogazkoy District Heating Project. By
these projects, Sistem Ltd. has gained valuable experiences about
Cogeneration and District Heating Systems, which brings environmentally
friendly and economical solutions to the energy shortage problems
becoming increasingly complicated in large metropolitan areas.
The tasks which were accomplished by Sistem Ltd. for Esenkent
District Heating projects were design and engineering services
for hot water underground piping network, material selection,
coordination of application, flushing, cleaning and testing of
the piping network. Within the scope of the same project, design,
installation and commissioning of compact heat exchanger terminals
that would provide radiator heating and domestic hot water for
the housing units were carried out also. The Compact Heating Terminals
were manufactured and pre-assembled at Sistem Ltd. 400 m2 covered
workshop, then were sent to the basements of buildings where they
are installed.